The estimator must decide whether to replace or repair a part. The labor time required to repair the part is 9.0 hours plus an additional material cost of $65.00. The new part will cost $625.00, and the allowable flat rate time is 2.0 hours to replace the new part. The labor rate is $45.00 per flat rate hour. Which is the more cost-effective repair?

What will be an ideal response?


Repairing the part will cost $470.00. Replacing the part will cost $715.00.

Trades & Technology

You might also like to view...

Size of the seam-weld expressed in ____ when the drawing is metric.

A. decimeters B. centimeters C. decameters D. millimeters

Trades & Technology

From a livestock auction of over 1,800 head of cattle, the weights and prices per hundredweight (cwt) of some steers and heifers are given in Table 3-1.


a. Make a line graph (putting both steers and heifers on the same graph) from the given data, putting the weights on the horizontal axis and the prices on the vertical axis.
b. At what weight would you receive the best price per heifer?
c. What is the percent increase or decrease in the price of a 300-pound steer compared to a 600-pound steer? (Note: Price per steer, not price per pound.)

Trades & Technology

Based on research to date, no behavioral problems among dogs and cats have been identified that result from underlying diseases (infections, parasites, metabolic or neurologic disorders)

A. True B. False

Trades & Technology

Using unsafe tools can not only cause injury, they can also _____

a. slow down completion of the job b. ruin finishing work c. cause environmental pollution d. distract your fellow workers

Trades & Technology