The air-conditioning system rough-in work normally begins:
A) After the house is completely dried in.
B) After all the interior walls are complete.
C) After most of the interior finish work is completed.
D) After the house is framed.
A
You might also like to view...
The geographic area from which a business attracts most of its customers is termed its demographic
Indicate whether the statement is true or false
Hogs were traditionally raised for _____.
Fill in the blank(s) with the appropriate word(s).
The elements of the gear structure include the face, hub, bore, keyway, and outside diameter.
Answer the following statement true (T) or false (F)
In a compound DC motor control circuit, the field loss relay will disconnect the _____ if power is lost to the _____.
A. rotor; armature B. armature; shunt field C. shunt field; armature D. armature; rotor