Problem 1.53 In the steel structure shown, a 6-mm-diameter pin is used at C and 10-mm-diameter pins are used at B and D. The ultimate shearing stress is 150 MPa at all connections, and the ultimate normal stress is 400 MPa in link BD. Knowing that a factor of safety of 3.0 is desired, determine the largest load P that can be applied at A. Note that link BD is not reinforced around the pin holes.
You might also like to view...
A bond beam in a masonry bearing wall building must be _________.
A) a steel, reinforced-concrete, or reinforced-masonry beam. B) a reinforced-concrete or reinforced-masonry beam. C) a steel, reinforced-concrete, reinforced-masonry, or wood beam. D) a steel or reinforced-concrete beam. E) none of the above.
Explain why the typical thickness of tilt-up wall panels is one of the following dimensions: 5-1/4 in., 7-1/4 in., or 9-1/4 in.
What will be an ideal response?
Budding is a form of grafting
Indicate whether the statement is true or false
Profibus-DP is a bus that ________
A) Is used for communication between distribution systems and PLCs B) Supports both analog and discrete signals C) Is used for process-level instrumentation D) Supports process control