The patriot missile, developed by Lockheed Martin, is designed to detect, identify, and shoot down aircraft and other missiles. The Patriot Advanced Capability-3 was originally promised to cost $3.9 billion, but due to extra time needed to develop computer code and scrapped tests (due to high winds) at White Sands Missile Range, the actual cost was much higher. If the total project development time was 10 years and costs increased at a rate of 0.5% per month, what was the final cost of the project?
What will be an ideal response?
F = 3.9(F/P,0.5%,120) (in $ billion)
= 3.9(1.8194)
= $7,095,660,000
You might also like to view...
The double acting push button has two terminal screws.
Answer the following statement true (T) or false (F)
The terms party wall and area-____ wall are often used interchangeably.
A. defining B. joining C. separation D. distinction
When jump starting, ________
A) The alternator must be disconnected on both vehicles B) The last connection should be the engine block of dead vehicle C) The last connection should be the positive post of the dead battery D) Both A and C
If the switch shown in Figure P5.63 is closed at t = 0 and:
VS = 170V RS = 7 k?
R1 = 2.3k? R2 = 7k?
L = 30mH C = 130?F
determine the current iL through the inductor and the voltage vC across the capacitor as t ??.