Why is it important for the estimator to review carefully the entire project manual?

What will be an ideal response?


It is important that the estimator study the project manual because the project must be built to meet all of the requirements of the project manual as well as the drawings. Items of significant costs are included in the project manual.

Trades & Technology

You might also like to view...

Many subcontractors subcontract out portions of the work, known as "____________________".

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A common terminal with both normally open and normally closed contacts is called a ____ contact.

a. terminal b. transfer c. VFD d. magnetic

Trades & Technology

Answer the following statement(s) true (T) or false (F)

1.In residential applications, Type NM cable is permitted to pass through environmental air handling spaces perpendicular to the long dimension of the space. 2.According to the NECĀ®, lighting fixtures must be installed in clothes closets. 3.According to the NECĀ®, all work spaces must be provided with illumination. 4.Residential electrical systems may be grounded using only the metal water pipe system and do not need a supplemental grounding electrode.

Trades & Technology

Which type of cleaning uses small living organisms to eat oil and grease?

A) Solvent B) Microbe C) High pressure spray D) None of these

Trades & Technology