When reinstalling rubber-bushed equalizing beams, what do you have to do before torquing the nuts to specification?
A. install the torque rods
B. ensure the equalizing beams are parallel to the frame
C. both A and B
D. neither A nor B
Answer: C
Trades & Technology
You might also like to view...
To what pressure must water be compressed at 50°C to change its density by 1%? Assume that ? is independent of P.
Express the volume expansivity and the isothermal compressibility as functions of density ? and its partial derivatives. For water at 50°C and 1 bar, ? =
Trades & Technology
The channel from a space probe to earth has a bandwidth B = 106 Hz and a channel capacity C = 0.8 x 107 bps. The signal-to-noise ratio ?S 2 /?N 2 equals ______.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
The accident site should be isolated until all pertinent evidence has been collected or observed and recorded.