____ elevations are part of the drawings used in the construction process to provide information for the building team and the municipality that will oversee the project.
A. Profile
B. Management
C. Working
D. Abstract
Answer: C
You might also like to view...
Who is responsible for ensuring the safety of workers on the construction site of a typical building project?
A) The structural engineer B) The architect C) The general contractor D) Occupation Safety and Health Administration of the U.S. Government E) All of the above collectively
For installing box-rib lagging on top surfaces, which of the listed methods is correct?
a. Lower sheets are installed on top of higher sheets. b. Screws are installed through the high surfaces of the ribs. c. Lagging is installed with the ribs running horizontally across the slope. d. Lagging is installed so the ribs run parallel to the longest dimension of the surface.
Most of the water flowing in rivers passed through a soil profile or over soil surfaces before reaching the river
Indicate whether the statement is true or false
Hot water boiler limit controls are usually set at ____________________°F.
Fill in the blank(s) with the appropriate word(s).