Shankar is scheduled to work 8.3 hours per day. How many hours will he work if he works 5.4 days per week?
What will be an ideal response?
44.8 hr
Trades & Technology
You might also like to view...
What is the average length of the mare's gestation cycle?
A. 315 days B. 328 days C. 335 days D. 350 days
Trades & Technology
An alternative to grounding the secondary is to let it ____; that is, the secondary remains ungrounded.
A. sink B. float C. surface D. exit
Trades & Technology
Which of the following is a primary characteristic of the data lock-out flip-flop?
A) Data is only clocked into the FF on the clock transition. B) Data can only be entered when the clock is high. C) Data cannot be entered into the FF unless the EN line is high. D) The master section is a pulse triggered type FF.
Trades & Technology
An arc is always dimensioned by giving the ____.
A. radius B. tangent C. diameter D. perspective
Trades & Technology