New clay or shale brickwork should not be washed for _____ after brickwork is completed.

A. two weeks
B. at least 7 days
C. 72 hours
D. 24 hours


Answer: B

Trades & Technology

You might also like to view...

The underlying sketch shows components of a glass-aluminum curtain wall. Using leader lines and labels, identify the following components: (i) vision glass, (ii) spandrel glass, (iii) vertical and horizontal pressure plates, and (iv) vertical and horizontal covers. How are the covers anchored to mullions and rails?




What will be an ideal response?

Trades & Technology

If you have the annual worth of an alternative with a 5-year life, you can calculate its perpetual annual worth by:

(a) no calculation needed. The perpetual annual worth is equal to the annual worth (b) multiplying the annual worth by (A?P,i,5) (c) dividing the annual worth by i (d) multiplying the annual worth by i

Trades & Technology

In hot climates, low-E coatings reflect as much as ____% of the infrared heat while allowing visible light to penetrate from outside.

A. 68 B. 75 C. 82 D. 90

Trades & Technology

A type of footing commonly used to support poured concrete or concrete block walls is a _____.