What occurs when an owner directs a change of scope?
What will be an ideal response?
Extra work is added to or deducted from the project, and it is clearly a change of scope to the contract. Owners will occasionally add or deduct portions of work that qualify as a change in scope. A change in the scope of the work is when the amount of work is changed from that contained in the contract, as indicated by the contract documents. A change order is almost always authorized for this kind of change, although the cost of the change will influence the owner's decision to accept it.
You might also like to view...
The 2's-complement system is to be used to add the signed binary numbers 11110010 and 11110011. Determine the sign and decimal value of each of these numbers and their sum
A) -27 and -13, -40 B) -11 and -16, -27 C) -113 and -114, -227 D) -14 and -13, -27
What is an advantage of using isometric sketches over orthographic ones?
What will be an ideal response?
A piece of 1 ? 4 or 1 ? 6 stock called a ____ is installed around the walls of a closet to support the shelf and the rod.
a.frame b.back band c.brace d.cleat
A compound is a combination of two or more chemicals:
A) That form a homogeneous mixture. B) That form a mixture which cannot be separated by distillation. C) That form a mixture which can be separated through distillation. D) That form a completely new chemical with its own physical and chemical properties.