Optional standby systems are covered in _____.
a. NEC Article 700
b. NEC Article 701
c. NEC Article 702
d. NEC Article 705
c. NEC Article 702
Trades & Technology
You might also like to view...
A contactor is a relay that contains ____________________ contacts.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
How many total welds are required to build one P/N 523808C0A?
Review drawing number 523808C0A and then answer the question.
Trades & Technology
PEL is the Permissible Exposure Limit (PEL) of a vapor expressed in parts of vapor per million parts of contaminated air.