Graph the numbers on a number line.-8, -10, -4, -6

A.
B.
C.
D.


Answer: A

Mathematics

You might also like to view...

The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can produce up to 24 rings each day using up to 60 total man-hours of labor. It takes 3 man-hours to make one VIP ring, versus 2 man-hours to make one SST ring.How many of each type of ring should be made daily to maximize the company's profit, if the profit on a VIP ring is $30 and on an SST ring is $40?

A. 16 VIP and 8 SST B. 12 VIP and 12 SST C. 0 VIP and 24 SST D. 8 VIP and 16 SST

Mathematics

Provide an appropriate response.Select a fraction that is proportional to .

A.
B.
C.
D.

Mathematics

Solve the equation symbolically.21.9 + 4.4t = 2.98

A. -18.92 B. -14.3 C. 62.72 D. -4.3

Mathematics

Perform the indicated operation. Write the answer in scientific notation.(2.7 × 10-5)(1.6 × 10-7)

A. 4.32 × 1012 B. 4.3 × 1012 C. 4.32 × 10-12 D. 4.32 × 10-2

Mathematics