How does Shewhart's Plan-Do-Study-Act cycle compare with Six Sigma's DMAIC cycle?
What will be an ideal response?
As the figure in the text shows, the generic steps for Six Sigma project implementation are similar to the Plan-Do-Study-Act problem-solving cycle espoused by Drs. Deming and Shewhart.
You might also like to view...
When operating a vehicle with a dual air brake system the driver's should
A. Let the vehicle warm up before driving to ensure that the fuel reaches the engine. B. Let the air compressor build up a minimum of 100 psi pressure in the primary and secondary systems before driving. C. Begin driving just after the vehicle starts.
A ____ is a chamber that can serve as a distribution area for heating or cooling systems, generally between a false ceiling and the actual ceiling, or between construction members.
A. plenum B. pathway C. chase D. vent
Why must mobilization be included in the cost of equipment?
What will be an ideal response?
How far apart should hangers for metal duct be placed?
What will be an ideal response?