The job of your team is to build a bridge that is connecting two tables.
Requirements:
The bridge has to be self-supporting, so no pillars are allowed in the middle of the
bridge.
Pedestrians shall be able to get onto the bridge from the level of the edge.
The building material for the bridge is plastic in form of toy Lego building bricks.
For the solution of the problem your team has received
? 4 large buckets of Lego building bricks
Your team has 30 minutes for planning and prototype a bridge (prototyping phase)
At the end of the prototyping phase all Lego parts have to be taken apart again.
Your team has 5 minutes to construct the bridge from scratch (the bridge has to be
built from scratch in the construction phase)
The beginning and the end of the phases are being signalled by the instructor.
After the construction phase, the bridge will be tested by the instructor using the
following acceptance criteria:
1. It has to hold up for at least one minute.
2. If it crashes before a minute is over, the number of seconds up to the
crash will be logged (and compared to the other team efforts).
You might also like to view...
When should an interviewer compose a written interview report and why?
What will be an ideal response?
The discipline for a stack is:
a) data first inserted is the data first out. b) for a misbehaving stack, 30 lashes. c) data last inserted is the data first out. d) depends on the application of the stack.
The term used to describe data that is added to the end of an existing table
a. Appended b. Exported c. Updated
When a video is inserted on a slide, the video formatting and editing tools display in the control panel below the video
Indicate whether the statement is true or false