A CAD operator realizes that it takes 36 minutes to plot a drawing. How long in hours will it take to plot 30 hard copies of the same drawing?
What will be an ideal response?
18 hours
Trades & Technology
You might also like to view...
What is Grade 60 rebar?
What will be an ideal response?
Trades & Technology
The water quality required to maintain the water level in the sump is called ____________________.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
Intermittent welds that have a pitch of 3 have 3 inches in between welds.
Answer the following statement true (T) or false (F)
Trades & Technology
Which of the following factors contribute to the dynamic response of a single control loop?
A. the instrument in a control loop B. the inertia of the controlled variable C. dead time D. all of the above
Trades & Technology