On oblique drawings lines drawn on freehand sketches and on instrument drawings should be drawn as construction lines in the beginning.

Answer the following statement true (T) or false (F)


True

Trades & Technology

You might also like to view...

When scaffolding is higher than two sections, it should be tied to the structure at every _____ of height with a heavy-gauge wire.

A. 16' B. 21' C. 26' D. 32'

Trades & Technology

The independent project estimates below have been developed by the engineering and finance managers at Golphanen Enterprises. The corpo­rate MARR is 8% per year, and the capital in­vestment limit set by the CFO is $4 million. As a new employee in the Engineering Department, you have been asked to recommend the econom­ically best projects. Use (a) hand solution, and (b) spreadsheet solution to determine your recommendation.

Trades & Technology

The ability to place fraudulent calls, as well as the amount of bandwidth needed to carry the signaling information, are two common problems associated with which form of in-band signaling?

A) multifrequency signaling (MF) B) single frequency signaling (SF) C) ear-to-mouth signaling (E&M) D) all are susceptible to these problems most of the time

Trades & Technology

Computer-aided design and drafting (CADD) is the process of using a computer with software for design and drafting applications.

Answer the following statement true (T) or false (F)

Trades & Technology