When installing an exposed grid ceiling system, the first component to be installed is the _____.

a. main runners
b. hanger inserts and wires
c. cross runners (tees)
d. wall angle


Answer: D

Trades & Technology

You might also like to view...

Refrigerant R-134a at 140 kPa has vf = 0.0007381 m3/kg and vg = 0.1395 m3/kg. The R-134a at 140 kPa has a mass of 5.0 kg. Plot the volume occupied by the R-134a as a function of quality for values of the quality ranging between 0.0 and 1.0.

Given: vf = 0.0007381 m3/kg; vg = 0.1395 m3/kg; m = 5.0 kg What will be an ideal response?

Trades & Technology

Which of the following items must be included in accessible lavatory installations?

a. providing legroom under the fixture b. covering supply and drainage piping with insulation c. equipping fixture with blade-handle, single-lever, or automatic-sensor faucets d. all of the above

Trades & Technology

A radius is a chord that passes through the center of a circle.

Answer the following statement true (T) or false (F)

Trades & Technology

A wiring job uses 1,232 feet of cable for 56 outlets. What is the average number of feet per outlet?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology