What can an owner do if that owner commissions a project using the design/build project delivery method and believes the arrangement does not provide it with an independent actor looking out for its design interests?
What will be an ideal response?
One solution to this issue, usually called “bridging,” involves the owner
hiring a design professional to create the preliminary design. This design
work, usually through the design development phase or approximately onethird to half of the design documents, is then used as a basis for obtaining
requests for proposals (RFP) from prospective design-builders.
You might also like to view...
Plugging is used with direct current motors more than with three phase squirrel cage motors.
Answer the following statement true (T) or false (F)
Hookworms are tenacious and have the ability to adhere to the lining of the digestive tract where they consume large quantities of blood. This may be lethal when more blood is consumed than can be generated within the dog's or cat's body
A. True B. False
Hematology is the study of
A. Oxygen-carbon dioxide exchange rate B. Immunizations C. Blood cells D. A and C above E. None of the above
Two technicians are discussing testing a catalytic converter. Technician A says that a vacuum gauge can be used and observed to see if the vacuum drops with the engine at 2500 RPM for 60 seconds. Technician B says that a pressure gauge can be used to check for backpressure. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician