What is the crew leader’s responsibility with regard to cost control?
a. Cost control is outside the scope of a crew leader’s responsibility.
b. The crew leader is only responsible for mainly minimizing material waste.
c. The crew leader must ensure that crew members are aware of project costs and how to
control them.
d. The crew leader prepares the project estimate, which dictates cost control.
c. The crew leader must ensure that crew members are aware of project costs and how to
control them.
You might also like to view...
Organizing the incident response planning process begins with staffing the disaster recovery committee.
Answer the following statement true (T) or false (F)
The subsequent problems, each of which is independent of the others, deal with the figure below,If all of the resistors are 1k, how much current does the microswitch draw in the normally closed (NC) position?
A. 0 A B. 5 mA C. 1 A D. 5 A E. 1 mA
Before the Opium Wars, which was the only Chinese city open for foreign trade?
a. Canton b Macau c. Shanghai d. Nanking
The minimum voltage reading you should expect when testing a thermocouple under load is _____
a. 24V b. 10mV c. 18V d. 30mV