Explain the primary differences between the CM as Agent or Advisor (CMa) and the CM as Constructor (CMc) delivery methods.
What will be an ideal response?
The CMa contracts only with the owner and has no contract relationship
with the subcontractors. An owner who uses a CMa often hires a prime
contractor and there is rarely any contract between design professional and
CM. By contrast, the CMc contracts with both the owner and the specialty
trades. The CMc displaces the need for a prime contractor, and looks very
much like a prime contractor in the eyes of the law. The CMa does not have
responsibility for actual performance of the work while the CMc does.
You might also like to view...
Multiply the following numbers to obtain the correct answer: 1,234 pounds x 17
What will be an ideal response?
A rubber balloon has a mass of 10 grams. The balloon is filled with air and forms a shape that may be approximated as a sphere with a diameter of 1.5 ft. What is the total mass the balloon? What would be the total mass of the balloon, if it is filled with helium instead? Express your answers in grams.
What will be an ideal response?
Lubricants made from a Paraffinic crude oil base stock have a relatively high viscosity index.
Answer the following statement true (T) or false (F)
What are conductors?
What will be an ideal response?