Sometimes sensors will have to be __________________ for the ECM that it is sending a signal to so that the ECM will know its "zero point"
a. calibrated
b. reflashed
c. turned on
d. metered up
A
You might also like to view...
What is a vessel that typically holds dry solids?
A) Bin B) Tank C) Dryer D) Filter
What component is directly responsible for moving the control rack in a port helix metering injection pump?
A. camshaft B. speed control lever C. decompression lever D. governor
The letter suffix combined with the number creates a __________which_identifies the specific reference notation used on the drawing.
A. keynote symbol B. keying legend C. reference symbol D. welding symbol
The outside diameter of schedule 40 black iron pipe is approximately:
A) 1/4 inch larger than the pipe's nominal size. B) 3/16 inch larger than the pipe's nominal size. C) The same size as the pipe's nominal size. D) 1/8 inch larger than the pipe's nominal size.