In engineering contracts, what is a typical format for payments to the engineering firm for design services?
What will be an ideal response?
For engineering contracts the typical format for payments to engineering firms for design services is the following:
a) 10% preliminary investigation
b) 35% preliminary design
c) 65% final design unchecked
d) 100% final design and checked
You might also like to view...
Technician A says the primary ignition coil can be tested with an Ohmmeter. Technician B says the secondary ignition coil can be tested with an oscilloscope. Who is correct?
A. Technician A B. Technician B C. Both A and B D. Neither A nor B
What is a kerf?
What will be an ideal response?
Which Italian state was the architect of national unification?
a. Kingdom of the Two Sicilies b. Savoy c. Nice d. Piedmont-Sardinia
Give an example of a First, Second, and Third class lever
What will be an ideal response?