What three main pieces of information are needed by the drafter in order to construct the fabrication details for a job?
What will be an ideal response?
In order to construct the fabrication details for a job, the drafter must have:
• the framing plan(s) for the job
• the sections
• the connection details
You might also like to view...
Henry VIII aided the entrance of Protestant beliefs into England when he
A. allowed Martin Luther to journey to England. B. broke England's ties with the Roman Catholic Church. C. removed himself as the head of the Church of England. D. ordered John Calvin to go to Switzerland. E. supported the Puritans.
Once differentiation begins, each cell loses part of its genetic code
Indicate whether the statement is true or false
The linear feet of window casing (not including waste) needed to trim two 3'-8" × 5'-0" interior windows
using the picture-frame method is approximately _____. a. 30' b. 40' c. 60' d. 70'
What is the standard value used for the gasket thickness?
Fill in the blank(s) with the appropriate word(s).