The _____ ______ _________ checks short-term fuel trim (STFT) and long-term fuel trim (LTFT) while the PCM is operating in closed loop.

Fill in the blank(s) with the appropriate word(s).


fuel system monitor

Trades & Technology

You might also like to view...

A(n) _____ identifies the problem and provides background and rationale for suggested campaign elements

a. situation analysis b. brand assessment c. audience survey d. product review

Trades & Technology

NEC Article 430 covers _____

a. the application and installation of motors b. provisions for motor-driven equipment c. general information on grounding d. thermal protection requirements

Trades & Technology

Division 2 describes work to be done on site, including Soil testing or core drilling or seismic exploration.

Answer the following statement true (T) or false (F)

Trades & Technology

Corrosion on electrical terminals may cause ____________

A) Increased current flow in the circuit B) Lights to be dimmer than normal C) Both A and B D) Neither A nor B

Trades & Technology