What is the main objective of conducting a transportation project evaluation?

What will be an ideal response?


The main objective of conducting a transportation project evaluation is to
furnish the appropriate information about the outcome of each alternative so that a
selection can be made. This evaluation process should be viewed as an activity in
which information that is relevant to the selection is made available to the person
or group responsible for making a decision.

Trades & Technology

You might also like to view...

An op-amp band-pass filter has a high-pass break frequency fH = 200/? Hz by using RI = 1k? in series with CI = ____ (x.x) ?F and a low-pass break frequency fL = 20,000/? Hz by using RF = ___(x.x) k? in series with CF = 0.01 µF.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Steam at 4 MPa and 400ºC flows through a 2-cm-diameter pipe. If the mass flux is 2 kg/min, the average velocity is nearest:

A) 10.8 m/s B) 9.8 m/s C) 8.8 m/s D) 7.8 m/s

Trades & Technology

When operators use portable power tools with wet hands, feet, or body parts, what safety device

should be used?

a. new power cords c. variable speed b. ground-fault circuit interrupter d. rubber mats

Trades & Technology

The speed of the universal motor increases if the frequency of the AC power source increases.

Answer the following statement true (T) or false (F)

Trades & Technology