Which of the following is the BEST example of a poor or careless construction method that can negatively affect a building's structural stability?
A. Design loads exceeding temporary loads
B. Structural supports built before loads are added
C. Improper sequencing of the construction process
D. Use of temporary bracing to support the building frame
Ans: C. Improper sequencing of the construction process
You might also like to view...
____________________ involves the removal of heat from a place where it is not wanted and depositing it in a place where it makes little or no difference.
What will be an ideal response?
Flowers worn by men are called
a. foliage c. boutonnieres b. corsages d. arrangements
According to the Vroom-Yetton-Jago model, what is the best measure of decision
effectiveness?
a. Concern for production and concern for people b. Availability of information and how structured the situation is c. The decision style used d. LPC score and situational favorableness e. Decision quality and subordinate acceptance of the decision
In what circumstances would bare-pipe evaporators most likely be used?
A) Air-conditioning coils B) Low-temperature refrigeration storage C) Medium-temperature walk-in cooler evaporators D) Heat pump indoor coils