A mason lays 41 concrete blocks in 3 hours. At this rate, how many blocks are laid in 6 hours?
What will be an ideal response?
82
You might also like to view...
A foundation system consisting of perimeter foundation walls and an elevated ground floor with an underlying crawl space is commonly used
A) for low-rise buildings in warm climates. B) for low-rise buildings in cold climates. C) where the water table is high. D) where the soil-bearing capacity is low. E) where the soil is expansive.
A platform was originally designed as a rectangle 12.00 meters long and 8.00 meters wide. The rectangular design is replaced with a platform in the shape of an ellipse. The elliptical platform will have the same area as the original rectangular platform and the major axis is 16.00 meters. Determine the minor axis rounded to 3 significant digits.
Fill in the blank(s) with the appropriate word(s).
Manicuring implements should be sanitized (washed & disinfected):
What will be an ideal response?
The two broad types of fan designs are
A) Centrifugal and axial B) Propeller and squirrel cage C) Forced draft and induced draft D) Forward curved and backward curved