A SIPS is typically a _____ look ahead in the schedule.

a. one-to-three-week
b. one-to-four-week
c. four-to-six-week
d. two-to-four-week


d. two-to-four-week

Trades & Technology

You might also like to view...

One ton of sand is needed for each _____ bags of masonry cement.

A. five B. six C. eight D. ten

Trades & Technology

Which of the following statements is correct regarding acceptance sampling?

A) The cost of the sampling plan must be balanced against the consumer's risk and the producer's risk. B) Sample inspection is 100% accurate. C) The producer's risk is that a batch with more than the acceptable number of defects will be rejected. D) Lots are accepted when the consumer's risk equals the producer's risk. E) The consumer's risk is that a lot with less than the acceptable number of defects will be accepted

Trades & Technology

The back-to-back measurement is always _____________ the end-to-end measurement.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Distance measurements made by the linear displacement transducer are determined by the __________.

A. magnitude of the electrical pulse launched by the transmitter B. strength of the twisting torque produced by the strain pulse C. time duration between the launch pulse and the strain pulse

Trades & Technology