Figure TB 17.5 is the DFD of the systems development life cycle as presented in the text
Required:
Explode bubble 4.0 Structured Systems Design into a Level 1 DFD. All of the process bubbles and data flows are presented below. The data flows for implementation plan and budget and logical specification are listed twice because these data flows will appear twice in the Level 1 DFD.
Process Bubbles
4.1 Specify modules
4.2 Develop implementation plan and budget
4.3 Develop implementation test plan
4.4 Develop user manual
4.5 Develop training program
4.6 Complete systems design document
Data Flows
Approved configuration plan
Approved systems design document
Design specifications
Implementation plan and budget
Implementation test plan
Implementation plan and budget
Logical specification
Logical specification
Training plan
User manual
You might also like to view...
According to the definition given in your textbook, which of the following does NOT represent a loss of research integrity?
A) withholding information B) falsifying data C) altering research results D) thinking strategically E) misinterpreting the data to make them consistent with predetermined points of view
Who describes social entrepreneurs as “restless people seeking to deal with problems that were not being successfully coped with by existing institutions?”
A. Steve Case B. Henry Ford C. Peter Goldmark D. Joseph Schumpeter
Which of the following statements is TRUE?
A) in many provinces the limitation period for most civil cases is 2 years B) a civil case must be tried in the jurisdiction where the key event occurred C) if a statement of defense is not filed on time the case will be dismissed D) the defendant has the choice in what location the trial will be heard in a civil case E) after the pleadings comes the debtor's examination
Andrew has been hired to do some work for Rossi Enterprises. What factors would a court consider in determining if Andrew is an employee or an independent contractor? Why does the designation matter?