There are code requirements for maintenance of plumbing drain lines. Which of the following need to be implemented? Select all that apply.
A) Cleanouts in horizontal drain lines at 75? minimum spacing for 4? and smaller piping.
B) Cleanouts at changes in direction of each vertical plumbing stack.
C) Cleanouts every 4 stories in roof drain leaders.
A) Cleanouts in horizontal drain lines at 75? minimum spacing for 4? and smaller piping.
B) Cleanouts at changes in direction of each vertical plumbing stack.
You might also like to view...
Items that may be selected by a cursor in CAD include lines, shapes, dimensions, and notes, as well as welding symbols.
Answer the following statement true (T) or false (F)
The primary consumer concerns within the biotechnology field today revolve around all of the following except:
a. environment c. cloning b. food d. forestry
Analyze the structure in the figure below by moment distribution. Determine all reactions and draw the shear and moment curves locating points of inflection and labeling values of maximum shear and moment in each span. Unless otherwise noted, EI is constant.
An ion is an atom that has had a(n) _____ added or removed.
A. electron B. neutron C. proton D. quark