List the three parts necessary to verify a position tolerance applied to a feature of size at RFS.
What will be an ideal response?
ANS:
Verifying a position tolerance applied to a feature of size at RFS has three parts.
1. Establishing the relationship specified in the feature control frame between the part and the datum reference frame.
2. Establishing the axis or centerplane of the unrelated actual mating envelope.
3. Verifying that the location of the axis or centerplane of the unrelated actual mating envelope is within the tolerance zone.
You might also like to view...
____ is the method used to pass the air–fuel mixture through the intake port of the engine.
a. Inflection b. Induction c. Direction d. Atomization
The discharge, liquid, and suction lines of a packaged unit are:
A) Located inside the unit. B) Located outside the unit. C) Located on top of the unit. D) Not necessary.
All of these are functions of antifreeze EXCEPT ________
A) Corrosion inhibitor B) Water pump lubricant C) Rust inhibitor D) Ethanol enhancer
What is the process called that changes an analog signal, such as a variable voltage signal, into a digital binary code signal?
What will be an ideal response?