Performing quantity takeoffs for ____ projects requires making cubic yard calculations.

A. concrete
B. prefabricated steel
C. post-and-beam
D. laminated arch


Answer: A

Trades & Technology

You might also like to view...

Using the wrong lubricant in a manual transmission could cause all of these EXCEPT ________.

A) Slipping clutch B) Damage to the composite blocker rings C) Hard shifting D) Damage to bearings

Trades & Technology

When inspecting a steering axle, Technician A uses a dial indicator to check knuckle vertical play. Technician B uses a protractor to check caster setting. Who is correct?

A. Technician A B. Technician B C. Both A and B D. Neither A nor B

Trades & Technology

The subsequent problems deal with the circuit below:Note: Each question is independent and doesn't depend on results from previous questions. The only values known initially are the values provided in each question.If X=1 and R=1, and then R changes to 0, Z will be

A. 1 B. uncertain C. 0

Trades & Technology

The advantage(s) of a Design/Bid/Build contractual arrangement is (are) _______

a. Reduced project time b. Non-adversary relationships among participants c. Known project cost before construction d. All of the above

Trades & Technology