Process technicians might have to work with:

A) Transportation equipment
B) Earth-moving equipment
C) Heavy-lifting equipment
D) All of the above


Answer: D
Explanation: A) Incorrect. Process technicians also might work with explosives, jackhammers, power tools, heavy lifting equipment, earth-moving equipment, and various transportation equipment, cutting tools, and other related equipment.
B) Incorrect. Process technicians also might work with explosives, jackhammers, power tools, heavy lifting equipment, earth-moving equipment, and various transportation equipment, cutting tools, and other related equipment.
C) Incorrect. Process technicians also might work with explosives, jackhammers, power tools, heavy lifting equipment, earth-moving equipment, and various transportation equipment, cutting tools, and other related equipment.
D) Correct. Process technicians also might work with explosives, jackhammers, power tools, heavy lifting equipment, earth-moving equipment, and various transportation equipment, cutting tools, and other related equipment.

Trades & Technology

You might also like to view...

Which section of the NECĀ® requires that at least 6" of free conductor length be left at each outlet box when cutting the branch circuit wires in preparation for connecting a light fixture?

a. NEC Section 300.14 b. NEC Section 314.23(F) c. NEC Section 410.130(F)(5) d. NEC Section 422.

Trades & Technology

The inner tube of heat exchangers of water-source heat pumps have extended surfaces called ____________________, which increase the surface area for better heat transfer.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A ____ is a guarantee that the loan will be paid as agreed.

A. permit B. certificate C. code D. mortgage

Trades & Technology

Determine (a) the absolute maximum values of shear and moment in the beam produced by the wheel loads and (b) the maximum value of moment when the middle wheel is positioned at the center of the beam in Figure P12.43.

Trades & Technology