The ground loop configuration that is used when there is a shortage of land is the ____________________.

Fill in the blank(s) with the appropriate word(s).


vertical

Trades & Technology

You might also like to view...

Why may weld testing be delayed for a week or so??

What will be an ideal response?

Trades & Technology

To provide a nailing base for siding installed over brick and masonry, attach furring strips made from _____

a. 3/8" × 1" lumber b. 1" × 2" lumber c. 1" × 3" lumber d. 1/2" × 2" lumber

Trades & Technology

A red arrow pointing to the right on a traffic light means you may:

a. turn in that direction after you come to a complete stop b. turn in that direction after slowing and checking traffic. c. not turn in that direction until the light turns green.

Trades & Technology

?To find the resistance of a circuit, divide the amperage by the voltage (I/R).

Answer the following statement true (T) or false (F)

Trades & Technology