Use the following information for questions 4 through 10.A leveling rod is used to check the finished height of a foundation wall at each of its four corners. The readings taken at the top of each corner are:Corner #1 - reading 19' - 1/8"Corner #2 - reading 18' - 11 7/8"Corner #3 - reading 19' - 1/4"Corner #4 - reading 19' - 3/16"Which of the four corners is the highest?
What will be an ideal response?
Corner #2
Trades & Technology
You might also like to view...
Find Zeq in the circuit of Fig. 9.68.
Trades & Technology
_______________ are used to cut away sections of the building and show details of construction.
A. Elevations B. Cutting planes C. Floor plans
Trades & Technology
The higher the rational runoff coefficient, the lower the percentage of rainfall that will become runoff
Indicate whether the statement is true or false
Trades & Technology
When the word "BOUNDARY" is placed below each feature control frame, it means that slotted holes are positioned by the extent of their boundaries.
Answer the following statement true (T) or false (F)
Trades & Technology