The windows would have been scheduled on the same sheet as the ________ schedule.

Fill in the blank(s) with the appropriate word(s).


door

Trades & Technology

You might also like to view...

It is estimated that it will take 217 labor hours to construct a block wall. Using a burdened hourly rate of $38.75 per labor hour, determine the labor cost to construct the wall.

What will be an ideal response?

Trades & Technology

What must be done to the wafer lug butterfly valve itself just prior to installation?

a. Lubricate the shaft. b. Open the valve. c. Close the valve. d. Align the flanges.

Trades & Technology

Describe pictorial dimensioning rules.

What will be an ideal response?

Trades & Technology

A cutting plane line staggers completely through an object at 90° angles. The section on the drawing is a(n) ____.

A. full section B. half section C. aligned section D. removed section E. none of the above