In an 7 1/2-hour workday, a bricklayer works two jobs. If he spends 3 3/4 hours on one job, how much time was spent on the second job in hours?

What will be an ideal response?


3 3/4

Trades & Technology

You might also like to view...

Which of the following is defined as a reduction in the primary air intake area that reduces the amount of gas being burned and results in a smaller, soft, and lazy flame?

a. overfiring b. underfiring c. spud d. high efficiency

Trades & Technology

The least common injury in a shop setting is an eye injury.

Answer the following statement true (T) or false (F)

Trades & Technology

What can result from a water-in-fuel condition when the secondary filter is capable of entrapping particulate as small as one micron?

A. filter burst B. plugged filter and shutdown C. filtering media failure D. water absorption into fuel

Trades & Technology

A working draft of a new media project is called what?

A. a prototype B. the presentation C. the information D. the content

Trades & Technology