Answer the following statement(s) true (T) or false (F)
1. Commissioning is the initial start-up and operation of a PV system
2. The electrical inspector will make sure that the building codes adopted by the local government are being followed.
3. Conductor insulation on PV systems should be rated for wet locations.
4. The last item to check when performing the final check is signage.
5. Stand-alone PV systems will require less maintenance than grid-tie systems.
1. TRUE
2. FALSE
3. TRUE
4. TRUE
5. FALSE
You might also like to view...
Dual-check valve backflow preventer assemblies are difficult for plumbers to remove, test, or replace because they _____.
a. have left-hand threaded connections b. do not have replaceable valve inserts c. are installed in very tight spaces d. are not normally fitted with shutoff valves or test cocks
Farmers' interest in policy is fairly homogeneous
Indicate whether the statement is true or false
Find the transmission parameters for the single-element two-port networks in Fig.19.98.
The specific gravity of water is:
A) 0.1. B) 5.0. C) 10.0. D) 1.0.