In a brick veneer assembly, weep holes are required
A) at each alternate floor level.
B) immediately above the flashing.
C) at each floor level.
D) 2 in. above a flashing.
E) immediately below the flashing.
B) immediately above the flashing.
You might also like to view...
Blocker ring clearance can be checked using a ________.
A) Dial indicator B) Dial bore gauge C) Plastigage D) Feeler gauge
One trillion grams is called a ____________________
Fill in the blank(s) with correct word
Vehicles with a bin number of 3 have ________ than vehicles with a bin number of 1
A) Less emissions B) The same emissions C) More emissions D) None of these
Which of the following is not a reason that polyethylene films has become the most popular greenhouse covering?
A. It has a long life expectancy. B. It is less expensive than most other coverings. C. When used as a double layer it has low heat loss. D. It comes in multiple thicknesses.