The subflooring and roof decking over the posts and beams construction is commonly 2X6, 2X8, or 1 1/8" (50X150, 50X200, or 28 mm) T&G plywood.

Answer the following statement true (T) or false (F)


True

Trades & Technology

You might also like to view...

Even the smallest hint of rust on a valve spring will require its replacement.

Answer the following statement true (T) or false (F)

Trades & Technology

What are some of the goals of U.S. farm policy?

What will be an ideal response?

Trades & Technology

Termites tend to enrich soils in the tropics much the same way as earthworms do in temperate region soils

Indicate whether the statement is true or false

Trades & Technology

You find that the CEC of a sandy loam soil at pH 5.0 is 8 cmolc/kg and at pH 8.2 it is 14 cmolc/kg. What is the most likely reason for this difference?

A) replacement of trivalent Al3+ ions with divalent Ca2+ ions at high pH. B) increase in the pH-dependent charges on 2:1 type silicate clays C) ionization of carboxyl and phenolic groups to release H+ ions D) removal of Al atoms from tetrahedral layers at low pH. E) removal of Al3+ ions from the exchange complex at higher pH.

Trades & Technology