The construction document set consists of
A) construction drawings and specifications.
B) construction drawings.
C) construction drawings and construction schedule.
D) construction drawings, construction schedule, and specifications.
E) construction drawings, construction schedule, and owner-contractor agreement.
A) construction drawings and specifications.
You might also like to view...
Job specifications should always be consulted before wire reinforcements are installed.
Answer the following statement true (T) or false (F)
Twelve sections of 3” pipe that is 57.8” long are used to construct a framework. How many standard 21’ lengths of pipe must be used to cut the sections?
What will be an ideal response?
Which is FALSE? Franchisers __________ .
A. May “shop” franchisees to make sure they run the business properly B. Must provide disclosure documents to prospective investors C. Provide a guarantee that investors will not lose their money when they buy the franchise D. Provide a recognized franchise name and support to franchisees designed help them prosper and stay in business
Which one of the following statements about the SQI sequencer is NOT true?
A) The SQI is like an equal comparison instruction but a mask is added, and multiple word combinations can be compared. B) The initial position value is 0 and the length is the number of bits in the mask. C) The source parameter contains the address of the input data word to be compared against the sequencer file words. D) The PLC 5 uses file registers and the control register; the ControlLogix uses tags, arrays, and a control tag.