Which of the following most closely describes a plot plan?

a. shows the building elements that form the supporting structure of the project
b. shows the plantings and site improvements for the project
c. shows the cut and fill data, finish elevations, surface drainage, and contours
d. shows the building location; sidewalks, curbs, and drives; mechanical items and service locations; and locations to adjoining streets


ANSWER: d

Trades & Technology

You might also like to view...

¿Cuál es una de las superficies con temperatura más elevada de las calderas?

a. Los tambores de vapor b. La descarga de gas de combustión c. La esquina de bajada d. El piso de la caldera

Trades & Technology

La herramienta para concreto que se muestra en la Figura 3 es _____.



a. un empalmador
b. una canteadora
c. un fratás
d. una llana

Trades & Technology

Which of the following is NOT included under the heading of organization change by

means of changing strategy?

a. Changing the organization's top-level goals b. Changing the business portfolio c. Entering into a partnership with another firm d. Entering the international markets for the first time e. Changing the primary basis of departmentalization

Trades & Technology

Determine the amount of rebar needed for the slab in Problem 51. The slab is reinforced with #4 rebar at 12 inches on center both ways. Assume two inches of cover and add 10 percent for lap and waste.

What will be an ideal response?

Trades & Technology