The bonding jumper for multiple disconnecting means is located _____.

a. on the supply side of the service disconnect
b. between the equipment and the equipment grounding bus
c. between the feeder panel and the equipment
d. between the equipment and ground bar


a. on the supply side of the service disconnect

Trades & Technology

You might also like to view...

Describe the LIM or limit test instruction.

What will be an ideal response?

Trades & Technology

Plunger to barrel clearances are lapped in manufacture in port-helix metering injection pumps to tolerances between:

A. one half and one micron B. two and four microns C. six and eight microns D. ten and twelve microns

Trades & Technology

The basic tenet of marketing, ____, applies to selling an interiorscape

a. “provide the broadest exposure possible” b. “advertise, advertise, advertise” c. “find a need, fill a need” d. “the customer is always right”

Trades & Technology

Explain the correct sequence of steps to complete a weld in the 2G vertical fixed position.

What will be an ideal response?

Trades & Technology