____ is a form of site-cast concrete.
A. Lift-slab construction
B. Tilt-up concrete construction
C. Tilt-down concrete construction
D. On-grade slab construction
Answer: B
You might also like to view...
The light sources (lamps) can be placed in three categories: ____, fluorescent, and high-intensity discharge (HID).
A. LED B. arc-generated C. halogen D. incandescent
The worker classes shown in Table 3 will be used to construct the Real Estate Office in Appendix E. Given the following information, determine the burdened hourly wage rate for each worker class. Assume the workers take full advantage of the retirement benefit.
What will be an ideal response?
An 8421 code is a(n) ____________________ code consisting of four binary digits.
Fill in the blank(s) with the appropriate word(s).
Convert 0.5 hours into minutes
What will be an ideal response?