A contractor's estimate for a job lists $17,850.00 for excavating and grading, $2,110.50 for concrete work, $890.00 for brick work, and $480.00 for setting stone. What is the total of this estimate?
What will be an ideal response?
$21,330.50
You might also like to view...
When a note applies to a particular part on an object, it is called a(n) ____ note.
A. general B. area C. identifying D. local
In ____, no vacuum or air pressure is used to form the part. Only the force of bending, stretching, or holding the hot sheet is used. ?
A. ?vacuum forming B. ?free forming C. ?mechanical forming D. ?drape forming
The Agriscience Fair provides the opportunity for students to compete with other students in their own school, state, and in the nation
Indicate whether the statement is true or false
While discussing power recirculating ball steering gear diagnosis:
Technician A says excessive steering wheel free play may be caused by a worm shaft bearing preload adjustment that is tighter than normal. Technician B says excessive steering wheel free play may be caused by loose steering gear mounting bolts.