A required topic in the OSHA-10 program is _____.
a. Focus Four Hazards
b. Six Safety Areas
c. Three Toxic Agents
d. Top Ten Threats
a. Focus Four Hazards
You might also like to view...
When the letters "____" are found in the tail of the arrow, a complete joint penetration weld is required regardless of the type of weld or joint preparation that is used.
A. CJP B. CPJ C. CPR D. JPC
The purpose of a supply pressure gauge is
1. to tell you how hot the air in the tank is 2. to warn you only if there is too little air in the tank 3. to tell you how much air is in the tank
Preformed wall panels that are lifted into place are called ____.
A. site-bonded B. field-bonded C. site-welded D. tilt-up
Before it is considered a continuous load, a load must operate for at least how many hours without interruption?
a. 3 b. 10 c. 12 d. 24