Which of the following is a complete closed loop planning system that develops plans for all materials and operations?

A) enterprise resource planning B) supply chain management
C) material requirements planning D) capacity requirements planning


A

Trades & Technology

You might also like to view...

Coordination among multiple ground-fault protectors is achieved by using a lower ____ setting and progressively shorter time settings on each of the downstream devices.

A. trip B. interrupt C. fuse D. arc

Trades & Technology

ASME Standard B30.9 provides guidance for chain slings regarding the minimal thickness at any point on the link, with the measurements based on _____.

a. the steel alloy from which the chain is made b. the size of the connected hooks or other hardware c. the nominal size of the chain link d. the length of the chain sling leg(s)

Trades & Technology

Spaying is generally recommended:

A) at birth B) before the female's first estrus cycle C) during the female's first estrus cycle D) after the female's first estrus cycle

Trades & Technology

The process of matting wool fibers together into a solid mass under high pressure is called:

a. Felting c. Crimping b. Scaling d. Scouring

Trades & Technology