When brazing on a refrigeration line with an attached service valve:

A) The valve should be cut out of the system prior to brazing to avoid overheating.
B) The joint should be heated quickly to avoid overheating the valve.
C) The line should be attached with quick-setting cement instead of brazed.
D) The joint should be heated slowly to prevent overheating the valve.


B

Trades & Technology

You might also like to view...

A grower planted a crop of poinsettias on schedule. She conducted proper watering, fertilization, pest control, pinching, chemical growth regulation and temperature control. At Christmas the crop had failed to flower and was still green and healthy. Explain how this could have happened

What will be an ideal response?

Trades & Technology

Inadequate purge flow rate will trigger which DTC?

A) P0300 B) P0446 C) P0440 D) P0400 or P0446

Trades & Technology

A Porta-Power® is an example of a(n) _____

a. electric tool b. pneumatic tool c. hydraulic tool d. battery-powered tool

Trades & Technology

List five items that would be included in an energized work permit._________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

What will be an ideal response?

Trades & Technology