A geothermal well is being dug costing $4,550.00.  In addition, 320 ft. of tubing for the system costs $3.17 per foot.  Labor costs are 4.5 hours at $43.00.  The owner gets a 12% discount from the government.  What is the final cost of the system to the owner??

Fill in the blank(s) with the appropriate word(s).


$5,066.95

Trades & Technology

You might also like to view...

Describe the differences between engineers, fabricators, and inspectors.

What will be an ideal response?

Trades & Technology

Facebook's acquisition of Instagram was risky because it cost the company a quarter of the cash they had on hand.

Answer the following statement true (T) or false (F)

Trades & Technology

A ballast in a fluorescent exit luminaire shall ____.

A. have GFCI protection B. have thermal protection C. not have thermal protection D. not have GFCI protection

Trades & Technology

The hybrid vehicle control system can detect a high voltage leakage to ground by use of ________

A) A ground fault monitor system B) A temperature sensing system C) Ground noise sensors D) Air bag sensors

Trades & Technology