Plot the ordered pairs on the rectangular coordinate system provided.A(-1, -2), B(-4, 6)
A.
B.
C.
D.
Answer: D
You might also like to view...
Find the cardinal number for the set.F = {x ? x ? N and x < 0}
A. n(F) = 0 B. n(F) = 1 C. n(F) = 2 D. n(F) = 100
Solve the problem. Use 3.14 as an approximation for ? where appropriate.The foundation for a cylindrical flower bed is a cylinder 24 in. in diameter and 3 in. high. How many cubic in. of concrete are needed to build the foundation (to the nearest hundredth)?
A. 452.16 in.3 B. 2712.96 in.3 C. 5425.92 in.3 D. 1356.48 in.3
Solve the problem. Round unit depreciation to nearest cent when making the schedule, and round final results to the nearest cent. A construction company purchased a piece of equipment for $1710. The expected life is 7000 hours, after which it will have a salvage value of $280. Find the amount of depreciation for the first year if the piece of equipment was used for 1600 hours. Use the units-of-production method of depreciation.
A. $320.00 B. $186.67 C. $228.00 D. $390.86
Find the domain.